Delete Streaming Locator

Deletes the Streaming Locator. If the Streaming Locator does not exist, a 204 is returned same as if it does.
Once the Streaming Locator is deleted, all future requests to the path owned by the Streaming Locator will fail. If content is
cached in a CDN, playback may continue to work for some time until the cached content expires.

Language
Authorization
Click Try It! to start a request and see the response here!